Can You Remove a Chimney Breast Without Building Regulations? (UK Guide)

You can’t normally remove a chimney breast without building regulations approval. It counts as structural work, even if you only take it out on one floor. You usually don’t need planning permission for work inside the house. This guide covers England and Wales.

Can I remove my chimney breast?

Usually yes, but not casually. You can remove the breast on one floor, several floors, or the whole chimney, as long as whatever stays is properly supported and building control is involved. Taking out a ground-floor breast and leaving the stack above unsupported is dangerous, and council guidance warns that it could eventually pull the wall over.

Why building regulations apply

A chimney breast is part of your home’s structure. It can help hold up the chimney stack above it and brace the walls around it. If you take it out, the rest of the building has to stay stable, and building regulations are there to check that it does.

Remove a chimney breast without building regulations: the approvals you usually need

Even removing the chimney breast on just one floor counts. Councils and building control teams treat it as a structural alteration, and they expect an application before the work starts.

Do you need planning permission?

Usually no. Taking out a chimney breast inside your home doesn’t change the outside of the building, so it isn’t normally development that needs planning permission.

There are two exceptions to check:

  • If your home is listed, you need listed building consent for changes like this.
  • If you are also taking down the chimney stack above the roof, or you live in a conservation area, different rules may apply.

How the chimney is supported

If you remove the chimney breast but keep the stack above it, the stack must be properly supported. Councils say it is not enough to simply step the brickwork out below it. Typical solutions include:

  • a gallows bracket fixed into the wall
  • a steel beam that takes the weight

A structural engineer designs the right support for your home, and building control approves it. You may also need to show that the remaining walls are stable without the brace the chimney breast provided.

Do you need a party wall notice?

If the chimney breast is on a wall shared with a neighbour, such as in a terraced or semi-detached house, you may need to serve a party wall notice before you start. See our guide to the party wall agreement to knock down a wall for how that works.

Check for hazardous materials

Older homes can contain materials such as asbestos around chimneys and flues. Get this checked before any work starts, and don’t disturb anything you’re unsure about.

What the process looks like

  1. Get a structural engineer to design the support. Our guide to the structural engineer cost to remove a wall explains what you can expect to pay. For price ranges, see our guide to the cost to remove a chimney breast.
  2. Apply to building control. You can use your local council or an approved private inspector.
  3. Let building control know before you start, and book inspections at the key stages.
  4. Get a completion certificate once the work is signed off, and keep it somewhere safe.

What happens if you skip it?

Work done without approval can be unsafe. It is also a common problem when you sell: buyers’ surveyors often spot a missing chimney breast, and solicitors ask for the completion certificate. A lack of paperwork can lead to a lower offer or a sale falling through, and you may be asked to open up the work at your own cost. The same logic applies to other structural changes, as covered in our guide to the building regulations to knock down a wall.

Scotland and Northern Ireland

Scotland and Northern Ireland have different systems, so don’t rely on this guide there. Contact your local council.

Frequently asked questions

Do I need planning permission to remove a chimney breast?

Usually no for internal work. Listed buildings need consent, and different rules can apply to the stack or in conservation areas.

Can I remove a chimney breast but keep the chimney stack?

Yes, but the stack must be properly supported, and building control must approve the design.

Do I need a structural engineer?

In practice, yes. They design the support for the stack and the stability of the remaining walls.

Can I just remove the fireplace?

Removing the fireplace and hearth is largely cosmetic. Removing the chimney breast itself is structural, so approval is normally needed.

Sources

This guide is based on advice from the Planning Portal, Homebuilding & Renovating and Redbridge Council’s building control guidance, reviewed in October 2026. It is general information, not professional advice. Last updated: 31 October 2026.