How Much Does It Cost to Remove a Chimney Breast in the UK? (2026 Guide)

The cost to remove a chimney breast in the UK is usually about £1,500 to £3,500, depending on how many floors it runs through and whether the stack above the roof is removed too. Some guides quote £4,000 to £5,000 or more for multi-floor or full removals. One large UK source puts the average at about £2,500, based on real quotes from tradespeople.

Typical cost to remove a chimney breast

Prices from UK cost guides, based on quotes given to homeowners:

  • Ground-floor chimney breast only: about £1,500 to £1,750, usually 1.5 to 2 days
  • First-floor chimney breast only: about £1,750 to £2,000
  • The whole chimney breast without removing the stack: about £2,200 to £2,400, usually 2 to 3 days
  • The whole breast and the stack above the roof: about £3,000 to £3,500, usually 3 to 4 days
  • The stack on its own: roughly £1,200 to £1,800, depending on the guide
Cost to remove a chimney breast UK price ranges by floors and stack removal

Another national guide puts stack removal at around £300 per metre, or about £1,800 for the average job.

These are guide prices, not quotes. Labour in London and the South East is usually higher.

How the main UK sources compare

Published figures vary a lot, and guides don’t always say what is included. This table shows two of them side by side:

SourceOne floorWhole breast, stack staysBreast and stack
MyJobQuote (real quotes, November 2026)£1,500 to £2,000£2,200 to £2,400£3,000 to £3,500
Rated People£3,000 to £3,200£4,400£4,800 or more

Other guides add more pieces to the picture:

  • Checkatrade: about £1,800 per project for removing the stack, or around £300 per metre, and about £2,500 for removing a breast with the stack left in place. It lists about £500 for a non-load-bearing chimney breast
  • Best Builders: £1,500 to £3,000 for a ground-floor breast with a steel beam and support above, and £2,200 to £4,000 for ground and first floors
  • Less.co.uk: from about £1,500 for one floor and about £3,000 for full removal, with an engineer’s report from about £300

The gap is large. Lower figures tend to come from real tradesperson quotes, and the higher ones may include structural support, finishing or bigger jobs. When you compare quotes, ask each one to list exactly what is included.

What decides the price

  • How many floors the chimney breast runs through
  • Whether the stack above the roof is also coming out
  • The size of the chimney breast
  • How the stack will be supported if it stays, with a bracket or a steel beam
  • Access, including whether scaffolding is needed
  • What is found once the wall is opened, which can include old flues or hazardous materials
  • Finishing work, such as plastering and flooring

Gallows bracket or steel beam?

If the stack above stays, it has to be properly supported once the breast below is gone. There are two main ways. Council building control guidance, such as Redbridge’s, says gallows brackets are only allowed in some situations:

  • when the stack isn’t completely vertical, for example where flues gather into a central stack
  • when the party wall that carries the bracket is at least 215 mm thick, in brickwork, and in sound condition

Where those conditions aren’t met, a steel beam, or a beam and posts, may be required. Trade guidance describes brackets as the cheaper and quicker option, widely used for first-floor and loft-level removals, while a steel beam costs more. Richmond Council also warns that it isn’t enough to simply corbel the brickwork out below the remaining stack. A structural engineer decides which method is right for your house.

Extra costs people forget

Structural engineer

If you are supporting the stack or the wall above, you’ll need an engineer’s design. One guide gives an average of about £400 for the report. See our guide to the structural engineer cost to remove a wall for what it covers.

Building control

You normally need to apply to building control, and there may be a fee. Our guide to removing a chimney breast without building regulations explains why.

Party wall agreement

If the chimney breast is on a shared wall, a party wall notice or agreement can add to the cost. One surveyor guide puts a party wall agreement at around £1,000. See our guide to the party wall agreement to knock down a wall.

Scaffolding and skip hire

Taking out the stack needs scaffolding, and all the rubble has to go somewhere.

Hazardous materials

In older homes, removing a chimney breast can uncover problems that were hidden before, such as asbestos. One guide puts asbestos removal at about £175 per square metre.

Making good

Allow for plastering, replacing flooring where the breast stood, and decorating.

One floor or all floors?

Builders often say it’s better value to remove the breast on every floor in one project, rather than coming back later for each room. If you’re thinking about doing more than one room, ask for a price for both.

Typical prices for the finishing work

  • Plastering the wall where the breast stood: about £250 to £400
  • Painting the room: about £400
  • Reboarding the ceiling, if it is damaged: about £250 to £600
  • A structural engineer’s report: about £300 to £400

Example budgets

To show how the pieces add up, here are two worked examples. They are illustrations made by adding published figures together, not real quotes, so use them for planning and not to price a job.

Example 1: a ground-floor chimney breast, with the stack supported above

  • Builder’s price, including support for the stack: £1,500 to £1,750
  • Structural engineer: about £400
  • Building control approval: £200 to £450
  • Plastering the wall: £250 to £400
  • Painting the room: about £400
  • Estimated total: about £2,750 to £3,400

Example 2: a first-floor bedroom chimney breast

  • Builder’s price: £1,750 to £2,000
  • Structural engineer: about £400
  • Building control approval: £200 to £450
  • Plastering the wall: £250 to £400
  • Painting the room: about £400
  • Reboarding the ceiling: £250 to £600
  • Estimated total: about £3,250 to £4,250

If the chimney breast was removed before you bought the house

Many buyers discover that a previous owner removed a chimney breast. If you are in that position:

  • ask for the building control completion certificate, because a buyer’s solicitor will usually want it
  • if there is no paperwork, have a structural engineer check how the stack above is supported, before you do more building work
  • don’t ignore it: Richmond Council warns that an unsupported stack can eventually pull the wall over

How to keep the cost down

  • Get at least three written quotes that say exactly what is included.
  • Ask whether the engineer’s fee, building control, scaffolding and making good are in the price.
  • Decide on the stack before you ask for quotes, so everyone prices the same job.
  • Combine the work with other building work in the same room.
  • Ask the builder to check for old flues and hazardous materials in advance.

Frequently asked questions

How long does it take to remove a chimney breast?

Usually about one to four days, depending on how many floors and whether the stack comes out too.

Is it cheaper to remove only the stack?

Often, yes, because the rooms inside aren’t disturbed. Check with your local council first, because rules can differ, particularly in conservation areas.

Do I need a structural engineer?

In practice, yes, if the breast is being removed and the stack or wall above needs support.

Does the price include building control?

Not usually. Ask your builder what is included.

Sources

Prices in this guide are based on UK cost guides from MyJobQuote, Checkatrade, Rated People, Best Builders, Less.co.uk and CompareMyMove, and on council building control guidance. MyJobQuote and Checkatrade figures were checked again on 23 November 2026. They are estimates, not quotes. Last updated: 23 November 2026